|
Home |
|
About Us |
|
Contact Us |
|
Product - GE Fanuc |
|
Product - ICSTriplex |
|
Career# |
|
Project List# |
|
Employee List |
|
Related Links |
|
Our projects list since from 2005 — Now |
|
Project List |
|
Expet Controls |
|
...the expert |
|
No. |
Details of Experience |
Vendor |
Finish Date |
|
1. |
Upgrade Tiong-A Gas Compressor Anti-Surge System |
PETRONAS CARIGALI SDN BHD |
May 2006 |
|
2. |
Independent Oil Terminal (IOT) Senari, Kuching |
ASSAR CHEMICALS C/o : Foxboro (M) Sdn Bhd |
May 2007 |
|
3. |
Dedicated BMS Controller for MIRI Crude Oil Terminal (MCOT) |
PETRONAS CARIGALI SDN BHD
SARAWAK OPERATION |
May 2006 |
|
4. |
HMI Upgrade For STS ST8100 |
BASF PETRONAS CHEMICALS SDN BHD
|
Feb 2006 |
|
5. |
HMI Interface Modifacation |
PETRONAS CARIGALI SDN BHD |
Mar 2006 |
|
6. |
Automatic Boiler Control Upgrade |
GAS DISTRICT COOLING (M) SDN BHD
|
Mar 2006 |
|
7. |
Automatic Boiler Control Upgrade |
GAS DISTRICT COOLING (KLIA) SDN BHD
|
Mar 2006 |
|
8. |
Intelligent Motor Control System (IMCS) for BAK-B Host Tie-Ins Baram South Development Project |
VASTALUX SDN BHD |
May 2006 |
|
9. |
DCS and ESD Systems for FPSO Brotojoyo, Indonesia |
KEAS Control System India Private Limited |
April 2006 |
|
10. |
EPCC of Sepanggar Bay Power Corporation (SBPC) Gas Metering Station, KKIP Sabah |
MISI SETIA OIL & GAS SDN BHD |
Sept 2006 |
|
11. |
Local Control Panel for Genset Change Out-Baton Platform |
EPC OIL & GAS SDN BHD |
May 2006 |
|
12 |
Genset Control Panel GCP-7715 (1000kW) |
SYNERGISTIC GENERATION SDN BHD |
Completed |
|
13 |
Provision To Manufacture, Supply, Design, Install and Commission of PLC Monitoring Controller System for TEMANA-A, TEMANA-B and BCOT |
PETRONAS CARIGALI SDN BHD
SARAWAK OPERATION |
Completed |
|
14 |
Upgrading To GE PLC For Angsi |
PETRONAS CARIGALI SDN BHD
PENINSULAR MALAYSIA OPERATION (PCSB-PMO) |
Mar 2007 |
|
15. |
IMS Upgrade – Services For GE Fanuc PLC Systems and ITS Peripherals for PCSB-PMO |
PETRONAS CARIGALI SDN BHD
PENINSULAR MALAYSIA OPERATION (PCSB-PMO) |
April 2007 |
|
16. |
Provision of Instrument Control Panel (ICP) For Gas Compression Module – Tinggi A Platform (ASP & PMCS Using ICS Triplex System) |
DELCOM SERVICES SDN BHD
|
Completed |
|
17. |
To Refurbish/Replace Pressure Transmitters for Anti-Surge Control and Module Recycle Control for Train-A/B Gas Compreesor |
PETRONAS CARIGALI SDN BHD |
June 2007 |
|
18. |
Compressor Control Cabinet For Sumandak |
MAMPAN JITU (M) SDN BHD |
April 2007 |
|
19. |
Supply and Installation of CPU For FPSO Perintis & Distributed Control System & Ethernet Controller Module for DCS. |
TRENERGY FPSO SDN BHD |
June 2007 |
|
20. |
Perry Aquarius Removal Skid |
DIALOG OTEC SDN BHD |
July 2007 |
|
21. |
Bekok-C Presurerization Cut Panel |
PETRONAS CARIGALI SDN BHD
PENINSULAR MALAYSIA OPERATION (PCSB-PMO) |
May 2007 |
|
22. |
Bekok-C Troubleshooting On GE Fanuc |
PETRONAS CARIGALI SDN BHD
PENINSULAR MALAYSIA OPERATION (PCSB-PMO) |
Completed |
|
23. |
Silo 3 Activation |
LANDFELD QUASA ENGINEERING SDN BHD |
Sept 2007 |
|
24. |
Petronas Methanol Labuan CCC Control Panel |
MAMPAN JITU (M) SDN BHD |
Aug 2007 |
|
25. |
PMCS & SIS System For Tanjung Langsat Oil Terminal |
DIALOG E & CSDN BHD |
Completed |
|
26. |
Installation & Commissioning Yokogawa Loop Controller (YS-170 & YS-150) |
MAKHOSTIA UTILITIES SDN BHD |
Sept 2007 |
|
27. |
Provision To Upgrade The RTU-MTU System at DDP-A, DDP-C & DYG-CPP Platforms. |
PETRONAS CARIGALI SDN BHD
PENINSULAR MALAYSIA OPERATION (PCSB-PMO) |
Completed |
|
28. |
Supply and Installation of Genius Block & Genius Bus Controller |
TRENERGY FPSO SDN BHD |
Dec 2007 |
|
29. |
600kW Generator Local Panel (GCP) For LGAST (GE Fanuc) |
SYNERGISTIC GENERATION SDN BHD |
On-Going |
|
30. |
Service For GE Fanuc PLC Systems and ITS Peripherals For PCSB-PMO (Bekok-C) |
PETRONAS CARIGALI SDN BHD
PENINSULAR MALAYSIA OPERATION (PCSB-PMO) |
Completed |
|
31. |
Provision To Supply, Install & Troubleshoot Prosoft Modbus Card At Angsi-A Platform |
PETRONAS CARIGALI SDN BHD
PENINSULAR MALAYSIA OPERATION (PCSB-PMO) |
Completed |
|
32. |
Installation & Commissioning Yokogawa Loop Controller YS-170 |
MAKHOSTIA UTILITIES SDN BHD |
Feb 2008 |
|
33. |
Supply, Install & Commissioning of The DCS HMI Cimplicity & FGS Genius Block for PERINTIS FPSO |
TRENERGY FPSO SDN BHD |
Mar 2008 |
|
34. |
Gas Compressor ICP Control Processor Upgrade Provision of ICS Triplex PLC Contractual Service Agreement for Tiong-A Platform |
PETRONAS CARIGALI SDN BHD, PMO
|
Completed |
|
35. |
To Supply & Install Thermocouple IO Card TG7560 at Angsi-A Platform |
PETRONAS CARIGALI SDN BHD, PMO
|
Completed |
|
36. |
Upgrade Control Panel for Diesel Emergency Generator at Tiong-A Platform |
PETRONAS CARIGALI SDN BHD, PMO
|
On-Going |
|
37. |
Train View Panel for MLNG-1 |
MAMPAN JITU (M) SDN BHD |
Completed |
|
38. |
Provision to Refurbish Bayan GT-401 UCP |
PETRONAS CARIGALI SDN BHD, SKO
|
Completed |
|
39. |
Provision to Upgrade the RTU/MTU System at Duyong-A, Duyong-C & Duyong CPP Platforms |
PETRONAS CARIGALI SDN BHD, PMO
|
Completed |
|
40. |
To Supply & Deliver Generator Control Panel for MAERSK OIL Qatar |
SYNERGISTIC GENERATION SDN BHD
|
On-Going |
|
41. |
Boiler Control System Upgrade (Redundant PLC) for GDC KLCC |
MAKHOSIA UTILITIES SDN BHD |
On-Going |
|
42. |
Supply of Rectifier Products for PGB, Segamat |
Petronas Gas Berhad |
Completed |
|
43. |
Design, Manufacture, Delivery and Integration of Instrumented Protective System (IPS) and Fire & Gas System for B-11 Re-development Project |
Yokogawa Controls (M) Sdn Bhd |
On– Going |
|
44. |
Gas Turbine Control Upgrade for Sabah Electricity Sdn Bhd |
APEX PETROLEUM ENGINEERING SDN BHD |
On– Going |
|
45. |
Supply, Install And Commissioning Of The Generator Panel Modification Works For MCOT Rejuvenation Project Phase 2 |
REKAYASA INDUSTRI MALAYSIA SDN BHD |
On– Going |
|
46. |
To Supply Of CPU Cards |
M3NERGY FPSO PERINTIS SDN BHD |
Completed |